top of page
Search

Harbour City

Electrical Modification Works

  • Replacement of IDMT Relay at HV Panel G8 & G12 at HV Switch room. No.2

  • Replacement of ventilation Fan for 11kV transformer for Chiller No.6

  • Replacement of temperature controller for transformer of PP63 VSD

  • Variable Speed Drive Upgrade for Secondary Chilled water Pump PP63 & PP65 at OG

  • Variable Speed Drive Upgrade for Secondary Chilled water Pump PP63 & PP64at OG

  • Supply & Install ABB VSD, control starter panel for flushing water pumps at Ocean Centre

  • Upgrading the Traditional Lighting to Dimmed LED at Electrical Spine and Mechanical Spine, Ocean Galleries

  • Supply and Replacement of Carpark Lighting Fixture (Phase 1 of 2) at Lower Carpark, Ocean Terminal-Replacement of Detuned Capacitor Bank at Switch Room ‘B’, Ocean Centre

  • Replacement of IDMT Protection Relays for LV Switchboard at World Finance Centre (South), Ocean Galleries

  • PITC to Fixed LV Electrical Installation at Ocean Terminal

  • PITC of LV Electrical Installation (Including Final Circuit) at Gateway I

 
 
 

Comments


Tel

Email

Address

Chatbot

2498-8657

Flat/RM V1, 01/F, Valiant Industrial Centre, 2-12 Au Pui Wan Street, Fotan, NT

SUBSCRIBE

Sign up to receive PMCL news and updates.

Thanks for submitting!

© 2023 by Profit Mark Consultants Limited.

Proudly created by WanaStay Limited.

ISO 9001 (Cert Logo Format)_CO-With HKAS Logo(Q862).jpg
bottom of page